Here are some of the works carried out by our company:
-
Supplying an ATS automatic transmission panel with a capacity of 630 amps (Andalusia Smouha Hospitals).
-
Supply and installation of a 3200-amp circuit breaker, Schneider brand (Andalusia Al Shalalat Hospitals).
-
Supplying a 400-amp electric distribution board, Schneider components (Infinity Company, Bashayer Al-Khair Project, Conference Hall 11).
-
Supplying Schneider brand lighting panels (Infinity Company, Villa Attia, Al-Salam Palace project).
-
Supplying a 250-amp electrical distribution panel, ABB components (Infinity Company, Smouha office
-
PWC) - supplying 2 electrical distribution panels of 630-amp, ABB components (Building Management Systems Company).
-
Supplying 800-amp electric distribution boards + ATS 400-amp automatic transfer board + 14 lighting panels (Trust Smart Systems). -
Supplying an ATS automatic transmission panel with a capacity of 630-amp (Trust Smart Systems).
-
Supplying an electricity distribution board with a capacity of 1000 amperes. (Al Saqr Company for Food Industries).
-
Supplying 1600-amp electricity distribution panels + lighting panels (Taba Real Estate Investment Company). Al Safwa Dream Compound project
-
Supplying 400-amp electricity distribution panels + lighting panels (Taba Real Estate Investment Company). Safwat Airport 2 Compound Project
-
Supplying electricity distribution boards 1600-amp + 1250-amp + lighting panels (Taba Real Estate Investment Company). King Heights Compound Project
-
Supplying electricity distribution panels 800-amp + 630-amp + lighting panels (Taba Real Estate Investment Company). Safwat Airport 1 Compound Project
-
Supplying EMDB distribution boards and services +DP.SERVICEES+LAND SCAPE (Infinity Company, Gleem Bay).
-
Supplying a 2500-amp distribution board (Al Saraya Interbuild Company).
-
Supplying 250-amp emergency services panel (Al Saraya Interbuild Company).
-
Supplying ABB brand breakers (Al Saraya Interbuild Company).
-
Supplying a 1600-amp distribution panel + ATS 1600 A panel, Schneider components (Trust Smart Systems Company), Mar Morcos Hospital project.
-
Supply of automatic transfer plate ATS 1600 A (Mar Morcos Hospital)
-
Supplying 15 lighting panels 100-amp (Andalusia Maadi Hospital)
-
Supplying a panel to improve the power factor, capacity of 600 KV (Alfa Foam Company).
-
Supply of operating panels for 4 pumps of 175 horsepower + improving the power factor, capacity of 100 kV (Fouka water station + Garawla).
-
Supply of operating panels for 4 pumps of 175 HP + improving the power factor, capacity of 100 kV (Sidi Abdel Rahman station + El Alamein station).
-
Supplying 6 public distribution panels of 250-amp + 6 service panels of 63-amp + 6 communication panels (Al-Amal Company, New Alamein, Egypt). 25- Supplying 240 panels measuring 120 * 50 * 35 cm (Lectro Engineering and Trade Company). And other companies that there is no space to talk about.
Our clients